濱(bin)州恒通電力(li)器(qi)材(cai)有(you)限公(gong)司(si)
聯(lian)系(xi)電話(hua):400-879-6696
服(fu)務(wu)熱(re)線:183-6493-6808
聯(lian)系(xi)地址:山(shan)東(dong)省濱(bin)州市無棣(di)縣海(hai)豐(feng)街(jie)道(dao)前(qian)橋村(cun)112號(hao)
地埋線(xian)探(tan)測(ce)儀使(shi)用方(fang)法(fa)
Methods of using buried line detectors
使(shi)用地埋線(xian)探(tan)測(ce)儀的步驟如下:
The steps to use a buried wire detector are as follows:
1.準備(bei)設(she)備。確保(bao)地埋線(xian)探(tan)測(ce)儀放置在平穩的地面(mian)上(shang)並(bing)插(cha)入(ru)電(dian)源,正確安(an)裝(zhuang)探(tan)測(ce)線圈(quan)並(bing)校(xiao)正設備(bei)以(yi)確保(bao)探(tan)測(ce)準確性。
1. Prepare the equipment. Ensure that the buried wire detector is placed on a stable ground and plugged into the power supply, correctly install the detection coil, and calibrate the equipment to ensure detection accuracy.
2.發(fa)射機設(she)置。開機(ji)後長(chang)按電(dian)源鍵,選擇檢(jian)測(ce)頻率(lv)並(bing)確(que)認,調(tiao)節輸出檔(dang)位和(he)輸出功率(lv),確保連接穩固(gu)並(bing)接觸良(liang)好。
2. transmitter settings. After turning on, press and hold the power button, select the detection frequency and confirm, adjust the output gear and output power to ensure a stable connection and good contact.
3.接收(shou)機(ji)設(she)置。開機(ji)後選(xuan)擇與發(fa)射機相(xiang)同(tong)的檢(jian)測(ce)頻率(lv),選擇檢(jian)測(ce)模式(shi)(寬峰(feng)、峰(feng)值、峰(feng)值箭頭、谷(gu)值),調(tiao)節增(zeng)益(yi),使(shi)用測(ce)深按鍵(jian)進(jin)行(xing)測(ce)深。
3. Receiver settings. After turning on, select the same detection frequency as the transmitter, select the detection mode (wide peak, peak, peak arrow, valley), adjust the gain, and use the depth measurement button for depth measurement.
4.直連法(fa)操(cao)作(zuo)。確保(bao)連(lian)接穩固(gu),將輸出線(xian)紅(hong)色(se)魚(yu)夾(jia)與測(ce)試樁(zhuang)測(ce)試線連(lian)接,黑(hei)色魚(yu)夾拉(la)與管(guan)道(dao)走(zou)向(xiang)垂(chui)直方向(xiang),黑(hei)色接地線完(wan)全插(cha)入(ru)土(tu)壤(rang)中(zhong),選擇(ze)潮(chao)濕(shi)濕(shi)潤(run)的土(tu)壤(rang)。

4. Direct connection method operation. Ensure a stable connection, connect the red fish clip of the output line to the test line of the test pile, pull the black fish clip perpendicular to the direction of the pipeline, fully insert the black grounding wire into the soil, and choose a damp and moist soil.
5.探(tan)測(ce)操(cao)作(zuo)。將探(tan)測(ce)線圈(quan)靠近地面(mian)並(bing)沿著要探(tan)測(ce)的區(qu)域慢(man)慢(man)移(yi)動,當探(tan)測(ce)線圈(quan)上(shang)的指示(shi)燈亮起(qi)時(shi),表示(shi)該位置探(tan)測(ce)到了(le)地埋線(xian)。
5. Detection operation. Move the detection coil closer to the ground and slowly along the area to be detected. When the indicator light on the detection coil lights up, it indicates that the buried line has been detected at that location.
6.數據處(chu)理(li)。使(shi)用自(zi)帶(dai)的數據處(chu)理(li)軟(ruan)件(jian)對(dui)數(shu)據進(jin)行(xing)處(chu)理(li)和(he)分析(xi),將設備連接到電(dian)腦上(shang),打(da)開數(shu)據處(chu)理(li)軟(ruan)件(jian),將探(tan)測(ce)儀中(zhong)存儲的數據導入(ru)到(dao)軟件中(zhong)進(jin)行(xing)處(chu)理(li)。
6. Data processing. Use the built-in data processing software to process and analyze the data, connect the device to the computer, open the data processing software, and import the data stored in the detector into the software for processing.
此外,在(zai)使(shi)用地埋線(xian)探(tan)測(ce)儀時,應(ying)註意,避(bi)免(mian)在(zai)強(qiang)磁場(chang)、電(dian)磁幹(gan)擾、電(dian)力交(jiao)流強(qiang)幹(gan)擾等(deng)環(huan)境(jing)下使(shi)用,確(que)保(bao)探(tan)測(ce)數據的準確(que)性和可(ke)靠性。
In addition, when using underground wire detectors, safety should be taken into consideration to avoid using them in environments with strong magnetic fields, electromagnetic interference, and strong electrical and AC interference, ensuring the accuracy and reliability of detection data.
本(ben)文(wen)由(you)地埋探(tan)測(ce)提供技(ji)術(shu)支持,更(geng)多的詳細精彩內(nei)容(rong)請點(dian)擊我(wo)們(men)的網站http://guoyaotang.cn/們(men)將會(hui)全心全意為(wei)您(nin)提(ti)供(gong)滿(man)意的服(fu)務(wu)。
截(jie)屏,微(wei)信(xin)識別(bie)二維(wei)碼