<small id="Nj9BMg"><legend></legend></small>

      <dd id="Nj9BMg"></dd>

      <small id="Nj9BMg"><tt id="Nj9BMg"></tt></small>

      1. <dl id="Nj9BMg"></dl>

        1. 歡迎(ying)來到濱(bin)州恒(heng)通電力(li)器材有(you)限公(gong)司(si)網站,我們竭誠(cheng)為(wei)您服(fu)務(wu)

          當(dang)前(qian)位置:首(shou)頁(ye)-資(zi)訊(xun)中心(xin)>行(xing)業(ye)新(xin)聞(wen)埋(mai)地(di)PE管LYA-SZ3示(shi)蹤(zong)線(xian)雙(shuang)線(xian)連(lian)體(ti)優勢

          埋(mai)地(di)PE管LYA-SZ3示(shi)蹤(zong)線(xian)雙(shuang)線(xian)連(lian)體(ti)優勢

          來源:http://guoyaotang.cn// 發(fa)布時(shi)間:日(ri)期:2023-11-30 0次(ci)

          1.雙(shuang)線(xian)的保險(xian)作(zuo)用(yong):

          1. The insurance function of dual lines:

          兩(liang)條單(dan)線(xian)壹(yi)起(qi)使(shi)用和(he)“雙(shuang)線結構(gou)設(she)計(ji)”的技術(shu)性能區(qu)別(bie),兩(liang)條單(dan)線(xian)同時使(shi)用時(shi)易(yi)纏(chan)繞(rao)產(chan)生(sheng)斷裂,兩(liang)條單(dan)線(xian)輔設(she)後(hou)無法達到相等(deng)長度(du)和(he)平(ping)行(xing)使(shi)用,抗拉的(de)受(shou)力(li)點(dian)分(fen)布不(bu)均勻,會(hui)導(dao)致(zhi)兩(liang)條單(dan)線(xian)斷裂的(de)先(xian)後(hou)不*,抗拉強(qiang)度只(zhi)能體(ti)現(xian)壹根線的(de)強(qiang)度。“雙(shuang)線結(jie)構(gou)設(she)計(ji)”,已(yi)經將(jiang)兩(liang)支線粘(zhan)在(zai)壹起(qi),由(you)於(yu)結(jie)構(gou)的(de)變(bian)化(hua),其技術(shu)性能形成*,可以(yi)相(xiang)等長度(du)輔設(she)、平(ping)行(xing)使(shi)用,抗拉的(de)受(shou)力(li)點(dian)均勻分(fen)布,形成統壹(yi)的(de)抗拉強(qiang)度技(ji)術(shu)指標,突(tu)破了(le)現(xian)有(you)示(shi)蹤(zong)線(xian)產(chan)品抗拉強(qiang)度低(di)的影(ying)響。

          The technical performance difference between using two single lines together and the "double line structure design" is that when two single lines are used at the same time, they are prone to entanglement and breakage. When two single lines are auxiliary, they cannot achieve equal length and parallel use, and the distribution of tensile force points is uneven, which can lead to uneven order of fracture of the two single lines. The tensile strength can only reflect the strength of one line. The "double line structure design" has already glued two branch lines together. Due to structural changes, its technical performance has formed *, which can be used in equal lengths and parallel. The tensile force points are evenly distributed, forming a unified tensile strength technical index, breaking through the influence of low tensile strength of existing tracer line products.

          2.便(bian)於(yu)工(gong)地(di)簡單(dan)檢(jian)測(ce)判(pan)斷示蹤(zong)線(xian)鋪(pu)設(she)的(de)質(zhi)量。

          2. Convenient for simple on-site inspection and judgment of the quality of tracer line laying.

          埋(mai)地(di)PE管LYA-SZ3示(shi)蹤(zong)線(xian)連(lian)接(jie)方式

          Connection method of LYA-SZ3 tracer line for buried PE pipes

          LYA-SZ3示(shi)蹤(zong)線(xian)有(you)的(de)防(fang)護(hu)接頭(tou),用於(yu)線與線之間的連(lian)接(jie),接頭(tou)具備防(fang)水

          The LYA-SZ3 tracer line has protective joints for connecting lines, which are waterproof

          防(fang)腐(fu)的(de)密(mi)閉(bi)腔(qiang)體(ti),將(jiang)示(shi)蹤(zong)線(xian)裸(luo)露(lu)線頭(tou)放(fang)置於(yu)密(mi)閉(bi)腔(qiang)體(ti)內(nei),從而(er)保護(hu)裸露(lu)的示蹤(zong)線(xian)頭(tou)無法被腐(fu)蝕;接(jie)頭(tou)由PE材料制(zhi)造,本(ben)身(shen)具(ju)備抗腐、抗老化(hua)的能(neng)力(li)。

          20230630111615766.jpg

          A corrosion-resistant sealed chamber, where the exposed tracer wire head is placed inside the sealed chamber to protect the exposed tracer wire head from corrosion; The joint is made of PE material and has the ability of corrosion resistance and aging resistance.

          薄(bo)膜示(shi)蹤(zong)線(xian)和(he)電線(xian)示(shi)蹤(zong)線(xian)的(de)連(lian)接(jie)方式:將(jiang)兩(liang)個(ge)線頭(tou)擰在(zai)壹(yi)起(qi),壹(yi)般選用熱(re)收(shou)縮管或(huo)防(fang)水膠(jiao)布做(zuo)為(wei)接頭(tou)的處(chu)理(li),防(fang)腐(fu)及防(fang)水效果(guo)根據(ju)熱縮管的(de)材質(zhi)及施工(gong)效(xiao)果(guo)決定(ding)。

          The connection method of thin film tracing wire and wire tracing wire: Twist the two wire ends together, and generally use heat shrink tubing or waterproof tape as the joint treatment. The anti-corrosion and waterproof effects are determined by the material and construction effect of the heat shrink tubing.

          埋(mai)地(di)PE管LYA-SZ3示(shi)蹤(zong)線(xian)探(tan)測(ce)性(xing)

          Detection of buried PE pipe LYA-SZ3 tracer line

          LYA-SZ3示蹤(zong)線(xian):常(chang)規(gui)鋪設(she),埋(mai)深(shen)≤1.8米時(shi),有(you)效(xiao)探(tan)測(ce)距(ju)離在1000米以(yi)上(shang);非(fei)開挖(wa)鋪設(she),埋(mai)深(shen)≤4米時(shi),有(you)效(xiao)探(tan)測(ce)距(ju)離在500米;非(fei)開(kai)挖(wa)鋪設(she),埋(mai)深(shen)≤7米時(shi),有(you)效(xiao)探(tan)測(ce)距(ju)離在300米。

          LYA-SZ3 tracer line: Conventional laying, effective detection distance above 1000 meters when buried depth ≤ 1.8 meters; When laid without excavation and buried at a depth of ≤ 4 meters, the effective detection distance is 500 meters; When laid without excavation and buried at a depth of ≤ 7 meters, the effective detection distance is 300 meters.

          薄(bo)膜示(shi)蹤(zong)線(xian):常(chang)規(gui)鋪設(she),埋(mai)深(shen)≤1.8米時(shi),有(you)效(xiao)探(tan)測(ce)距(ju)離在150米內(nei);不能(neng)用於(yu)非(fei)開(kai)挖(wa)鋪設(she)。

          Thin film tracer line: Conventional laying, effective detection distance within 150 meters when buried depth ≤ 1.8 meters; Cannot be used for non excavation laying.

          電線(xian)示(shi)蹤(zong)線(xian)和(he)LYA-SZ3類(lei)同,但(dan)是(shi)非開(kai)挖(wa)鋪設(she)要(yao)用到截面積在6平(ping)方以上(shang)的電線(xian),成本造(zao)價不(bu)適(shi)宜(yi)。

          The wire tracing line is similar to LYA-SZ3, but non excavation laying requires wires with a cross-sectional area of more than 6 square meters, which is not cost-effective.

          埋(mai)地(di)PE管LYA-SZ3示(shi)蹤(zong)線(xian)非(fei)開(kai)挖(wa)穿越(yue)的應(ying)用(yong)

          Application of Buried PE Pipe LYA-SZ3 Tracer Line in Non Excavation Crossing

          將(jiang)示(shi)蹤(zong)線(xian)捆(kun)綁(bang)在(zai)設(she)備托(tuo)頭(tou)的鋼絲(si)環上(shang),並(bing)用鐵(tie)絲(si)或(huo)卡環再(zai)次(ci)緊(jin)固(gu)。

          Bundle the tracer wire onto the steel wire ring of the equipment support head and tighten it again with iron wire or snap ring.

          每隔(ge)5-8米(mi)的(de)距離,用(yong)膠(jiao)帶(dai)將(jiang)示(shi)蹤(zong)線(xian)和(he)PE管固(gu)定。

          Fix the tracer line and PE pipe with tape every 5-8 meters.

          頂(ding)管完(wan)成後,將(jiang)示(shi)蹤(zong)線(xian)壹(yi)端(duan)的兩(liang)條線(xian)連(lian)接(jie)在壹起(qi),用(yong)萬(wan)用(yong)表(biao)測(ce)量示蹤(zong)線(xian)的(de)另壹端(duan)看是否(fou)有(you)通路。

          After the pipe jacking is completed, connect the two wires at one end of the tracer line together, and use a multimeter to measure the other end of the tracer line to see if there is a pathway.

          相(xiang)關產(chan)品 / Related products

          • 地釘

            地釘

          • 地(di)釘

            地(di)釘(ding)

          • 警示樁

            警示(shi)樁

          • 警示(shi)樁

            警示(shi)樁

          截屏,微(wei)信識(shi)別(bie)二維(wei)碼

          1b3iB
          国产羞羞的视频在线 麻豆入口国产精品 在线可以看的中文字幕 曰韩欧美一区二区三区在线 亚洲人在线播放午夜一区 亚洲中文字幕a v在线播放 久久久久久影视一区二区三区 国产91丝袜在线播放动漫蜜月 精品一区日韩欧美在线 亚洲观看一区中文字幕 欧美一区二区三区aaa 日本精品人成视频在线观看 野花电影在线观看免费中文 一区二区三区乱码在线a 久久婷婷一区二区免费 久久国产成人精品不卡

              <small id="Nj9BMg"><legend></legend></small>

              <dd id="Nj9BMg"></dd>

              <small id="Nj9BMg"><tt id="Nj9BMg"></tt></small>

              1. <dl id="Nj9BMg"></dl>