1、電纜標(biao)誌(zhi)樁應(ying)安裝在(zai)管道(dao)的(de)正(zheng)上(shang)方(fang),當(dang)電纜標(biao)誌(zhi)樁用(yong)作轉(zhuan)角樁(zhuang)時,應安(an)裝(zhuang)在(zai)轉(zhuan)角段(duan)中點(dian)的(de)正(zheng)上(shang)方(fang)。當(dang)管道(dao)正(zheng)上(shang)方沒有安(an)裝(zhuang)條(tiao)件時,可設置(zhi)在(zai)相對(dui)距(ju)離(li)教近的(de)路(lu)邊(bian)綠(lv)化帶(dai)內,並在(zai)電纜標(biao)誌(zhi)樁上(shang)標明管樁適意(yi)圖(tu)。
1. Cable marker piles should be installed directly above the pipeline. When used as corner piles, cable marker piles should be installed directly above the midpoint of the corner section. When there are no installation conditions above the pipeline, it can be set up in the roadside green belt that is relatively close to the pipeline, and the suitability diagram of the pipeline pile can be indicated on the cable marker pile.
2、全封閉禁(jin)入道(dao)路(lu)不(bu)得設(she)置電纜標(biao)誌(zhi)樁。電纜標(biao)誌(zhi)樁的(de)安(an)裝(zhuang)間距(ju)宜為100m。地(di)面(mian)平(ping)坦(tan)、視礙少(shao)、管道(dao)路(lu)由(you)順直(zhi)的(de)情況(kuang),電纜標(biao)誌(zhi)樁的(de)安(an)裝(zhuang)間距(ju)可大100m。特(te)殊(shu)地(di)段(duan),具(ju)體鋪設(she)規範(fan)制度(du)進(jin)行(xing)管道(dao)標(biao)誌(zhi)樁的(de)鋪(pu)設(she)!
2. Cable markers shall not be installed on fully enclosed and restricted roads. The installation spacing of cable marker posts should be 100m. When the ground is flat, there are few visible obstacles, and the pipeline routing is smooth, the installation spacing of cable marker piles can be increased by 100m. In special areas, the specific laying standards and regulations shall be followed for the laying of pipeline marker piles!
3、電纜標(biao)誌(zhi)樁是(shi)埋(mai)設(she)在(zai)天然氣高(gao)壓(ya)管(guan)線(xian)沿(yan)線以塑鋼、玻(bo)璃(li)鋼(gang)、復(fu)合(he)材(cai)質為(wei)主,塗有黃色標記的(de)電纜走(zou)向標誌(zhi)樁,為(wei)起提(ti)示警示作用(yong),標有“燃氣管道(dao)、燃氣電話(hua)、管線(xian)樁號(hao)、管(guan)線(xian)走(zou)向、電子巡檢(jian)信(xin)息(xi)鈕”,便(bian)於(yu)巡線(xian)搶修(xiu)人員(yuan)迅(xun)速找(zhao)準(zhun)管(guan)線(xian)位(wei)置(zhi),贏得搶(qiang)修(xiu)時機。根(gen)據(ju)《城(cheng)鎮(zhen)燃氣管理(li)條(tiao)例》第(di)三(san)十(shi)六條(tiao)要求,擅(shan)自(zi)拆除和移(yi)動(dong)天然氣高(gao)壓(ya)管(guan)線(xian)上(shang)埋(mai)設(she)的(de)電纜標(biao)誌(zhi)樁屬(shu)於(yu)違(wei)法(fa)行(xing)為。
3. Cable marker stakes are mainly made of plastic steel, fiberglass, and composite materials buried along natural gas high-pressure pipelines. They are painted with yellow markings and are marked with "gas pipeline, gas telephone, pipeline pile number, pipeline direction, and electronic inspection information button" to serve as a warning. This facilitates line patrol and repair personnel to quickly locate the pipeline position and win the opportunity for repair. According to Article 36 of the Urban Gas Management Regulations, it is illegal to dismantle and move cable markers buried on high-pressure natural gas pipelines without authorization.
電纜標(biao)誌(zhi)樁施(shi)工註意(yi)事項
Construction precautions for cable marker piles
“七大”步驟流程(cheng):準(zhun)備的(de)工作——相(xiang)關儀器(qi)的(de)檢(jian)查(zha)和矯(jiao)正(zheng)——進(jin)行(xing)測量(liang)放(fang)線——固(gu)定交(jiao)樁(zhuang)——規劃線路(lu)——調整(zheng)交(jiao)樁——完(wan)工後需(xu)要(yao)記錄(lu)相(xiang)關信(xin)息(xi)。
The process of the "Seven Major" steps: preparation work - inspection and correction of relevant instruments - measurement and setting out - fixing of stakes - planning of routes - adjustment of stakes - recording of relevant information after completion.

準(zhun)備工作重(zhong)要(yao):
Preparation work is important:
1、詳(xiang)細(xi)查(zha)看研(yan)究(jiu)放(fang)線區(qu)域的(de)完(wan)整(zheng)的(de)施(shi)工作業(ye)圖紙(zhi)。
1. Detailed review of the complete construction operation drawings for the research and layout area.
2、提(ti)前準備交樁記錄(lu)需(xu)要的(de)表(biao)格(ge)及(ji)了解接(jie)樁組(zu)成人員(yuan)便(bian)於(yu)溝(gou)通。
2. Prepare the necessary forms for pile handover records in advance and understand the personnel responsible for pile handover for easy communication.
3、準備符(fu)合(he)要(yao)求的(de)測(ce)量(liang)儀器(qi)、木(mu)樁、標(biao)筆、白石(shi)灰(hui)以及(ji)其他(ta)工具(ju)。
3. Prepare measuring instruments, wooden stakes, markers, lime, and other tools that meet the requirements.
4、將需要(yao)測(ce)量放(fang)線使(shi)用(yong)的(de)工具(ju)進行(xing)矯(jiao)正(zheng),還需要保(bao)證(zheng)這(zhe)些工具(ju)必須(xu)在(zai)規定的(de)有效(xiao)期(qi)範(fan)圍之(zhi)內(nei)。
4. Correct the tools used for measuring and setting out, and ensure that these tools are within the specified validity period.
標(biao)誌(zhi)樁在(zai)操作方(fang)面需(xu)要(yao)註(zhu)意(yi):
Attention should be paid to the operation of marker posts:
1、測(ce)量放(fang)線的(de)基準(zhun)點(dian)壹(yi)定要(yao)采(cai)用(yong)GPS定位(wei),其中放(fang)線基準(zhun)點(dian)是指(zhi)設計(ji)控制樁和水準基樁(zhuang)。
1. The benchmark for measuring and setting out must be determined using GPS positioning, where the benchmark for setting out refers to the design control piles and leveling foundation piles.
2、壹(yi)定要(yao)按(an)照(zhao)圖紙(zhi)的(de)作(zuo)業(ye)要求設(she)置(zhi)控制樁,壹(yi)定要(yao)表(biao)明樁號(hao)、裏程(cheng)、地(di)面(mian)標(biao)高(gao)、轉(zhuan)角高(gao)度(du)等(deng)數(shu)據(ju)。
2. It is necessary to set up control piles according to the requirements of the drawings, and indicate data such as pile number, mileage, ground elevation, and corner height.
3、在(zai)定測(ce)資料(liao)和平(ping)面(mian)或(huo)是斷面圖(tu)紙(zhi)上(shang)表(biao)明地下的(de)障(zhang)礙(ai)物,其次(ci)是(shi),要保(bao)證(zheng)線路(lu)和地(di)下(xia)構築物交叉(cha)兩(liang)側(ce)的(de)控(kong)制範(fan)圍為3米(mi),同時,必須(xu)要(yao)設(she)置警告(gao)牌(pai)和標(biao)誌(zhi)樁。標(biao)誌(zhi)樁上(shang)必須(xu)要(yao)寫(xie)上相(xiang)關的(de)數(shu)據(ju)。比(bi)如:埋(mai)深,交(jiao)叉(cha)尺寸(cun)等。
3. Indicate underground obstacles on location survey data and plan or section drawings. Secondly, ensure that the control range on both sides of the intersection of the line and underground structures is 3 meters. At the same time, warning signs and marker stakes must be set up. Relevant data must be written on the marker post. For example: burial depth, crossing size, etc.
4、關於(yu)劃線方(fang)面,要根(gen)據(ju)軸(zhou)線和標(biao)誌(zhi)樁的(de)界限之(zhi)間拉(la)壹(yi)根(gen)繩子,撒(sa)上(shang)白石(shi)灰(hui)劃線。完(wan)成劃線,要(yao)清(qing)理(li)現場的(de)障(zhang)礙(ai)物。
4. Regarding the marking, a rope should be pulled between the axis and the boundary of the marker post, and white lime should be sprinkled to mark the line. Complete the marking and clear any obstacles on site.
5、關於(yu)移(yi)樁(zhuang)方面,是在(zai)劃線完(wan)成之(zhi)後(hou)打(da)掃(sao)清(qing)理(li)之(zhi)前,將所有需(xu)要(yao)的(de)線(xian)管(guan)樁(zhuang)平(ping)移(yi)到土堆(dui)的(de)旁(pang)邊(bian),範(fan)圍控制在(zai)0.3m。
5. Regarding pile relocation, it is necessary to move all required line pipe piles to the side of the soil pile after completing the marking and before cleaning, with a range controlled at 0.3m.
有了
電纜警(jing)示樁上(shang)面(mian)的(de)小總結(jie),希望對(dui)廣(guang)大客(ke)戶有所幫(bang)助,如果有什麽(me)不(bu)理解的(de)或(huo)者尋求幫(bang)助的(de)請(qing)點(dian)擊(ji)我們的(de)網(wang)站(zhan):
http://guoyaotang.cn/或(huo)者來(lai)電咨詢(xun),我(wo)們會盡全(quan)力為您
With the summary above the cable warning post, we hope it can be helpful to our customers. If you have any questions or need help, please click on our website: http://guoyaotang.cn/ Or call to inquire, we will do our best to solve it for you